Here are some work in progress images on de_boardroom.
- Level flow is basically done. There are a few questionable areas that I need to hammer on.
- Ready to block in some better brushwork in the atrium. I’ve got a sweet reference image I’ll use.
- Nav is in and working great, except in the elevator shaft. Bots are getting stuck so I’ll need to zhuzh the clip brushes and nav mesh there.